National Storage Mechanism | Additional information
RNS Number : 8515X
Sylvania Platinum Limited
28 April 2023
 

 

 

Description: C:\Users\Ian\Desktop\SYLVANIA PLATINUM\Sylvania Platinum logo.jpg                                                                                                                                     

 

 

 

 

                             _____________________________________________________________________________________________________________________________

 

28 April 2023

 

 

Sylvania Platinum Limited

 ("Sylvania", the "Company" or the "Group")

 

 

Third Quarter Report to 31 March 2023

 

 

Sylvania (AIM: SLP), the platinum group metals ("PGM") producer and developer with assets in South Africa, announces its results for the quarter ended 31 March 2023 ("Q3" or the "quarter"). Unless otherwise stated, the consolidated financial information contained in this report is presented in United States Dollars ("USD" or "$").

 

Highlights

  • Sylvania Dump Operations ("SDO") produced 17,926 4E (22,884 6E) PGM ounces in Q3 (Q2: 19,276 4E (24,630 6E) PGM ounces);
  • SDO recorded $26.5 million net revenue for the quarter (Q2: $37.1 million);
  • Group EBITDA of $9.8 million (Q2: $20.0 million);  
  • Group cash balance of $144.2 million (Q2: $123.9 million);
  • Successful commissioning of Tweefontein MF2 improves metal recoveries; and
  • Optimisation of blending improves results, especially at the Eastern operations.

 

Outlook

  • FY2023 production guidance increased, targeting 72,000 to 74,000 4E PGM ounces following strong production to date;
  • Lannex MF2 construction in progress, with commissioning scheduled during HY1 FY2024, which will further improve PGM recovery efficiencies;
  • The recent relogging and additional sampling data collected at Volspruit will be subject to an updated Mineral Resource Estimate ("MRE") during Q4 FY2023, which will include a rhodium resource over 100% of the project area;
  • Available data from recently completed La Pucella study and historical exploration are being analysed to develop an exploration strategy to prove continuity over the entire Aurora strike length;
  • Work on the Hacra project continues towards a MRE, using updated data from the recently completed relogging program; and
  • The Group maintains strong cash reserves to: allow funding of capital expansion and process optimisation projects; upgrade the Group's exploration and evaluation assets; and return value to shareholders.

  

 

Commenting on the Q3 results, Sylvania's CEO, Jaco Prinsloo said:

 

"The SDO delivered 17,926 4E PGM ounces for the quarter, which was ahead of expectations. Traditionally Q3 is a lower quarter in terms of production as a result of the slower start-up after the December break at the host mines and the shorter February month. In comparison with Q3 FY2022, production increased by 13.2% due to various interventions at the operations which have assisted in improving the recovery efficiencies at some of the plants.  

 

"The 21% decrease in the basket price for the quarter, particularly reflecting the rhodium and palladium prices, impacted revenues but the Company remains in a strong cashflow and cash position.

 

"With the strong production performance for the year to date and positive results following the post-commissioning optimisation of the Tweefontein MF2, the Company is pleased to increase the annual PGM production guidance to between 72,000 and 74,000 4E PGM ounces for FY2023."

 

 

 

Disclaimer

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse regulation (EU) no.596/2014 as amended by the Market Abuse (Amendment) (EU Exit) Regulations 2019.

 

For the purposes of MAR and Article 2 of Commission Implementing Regulation (EU) 2016/1055, this announcement is being made on behalf of the Company by Jaco Prinsloo.


  

USD

Unit

Unaudited

Unit

ZAR

Q2 FY2023

Q3 FY2023

% Change

% Change

Q3 FY2023

Q2 FY2023

 

 

 

 

Production

 

 

 

 

645,832

575,973

-11%

T

Plant Feed

T

-11%

575,973

645,832

1.94

1.92

-1%

g/t

Feed Head Grade

g/t

-1%

1.92

1.94

341,528

322,366

-6%

T

PGM Plant Feed Tons

T

-6%

322,366

341,528

3.22

2.98

-7%

g/t

PGM Plant Feed Grade

g/t

-7%

2.98

3.22

57.78%

55.58%

-4%

%

PGM Plant Recovery1

%

-4%

55.58%

57.78%

19,276

17,926

-7%

Oz

Total 4E PGMs

Oz

-7%

17,926

19,276

24,630

22,884

-7%

Oz

Total 6E PGMs

Oz

-7%

22,884

24,630










2,432

1,932

-21%

$/oz

4E Gross basket price2

R/oz

-20%

34,305

42,859










 

 

 

Financials3

 

 

 

 

33,113

25,034

-24%

$'000

Revenue (4E)

R'000

-24%

444,488

583,437

3,587

3,193

-11%

$'000

Revenue (by-products including base metals)

R'000

-10%

56,681

63,210

357

-1,717

-581%

$'000

Sales adjustments

R'000

-585%

-30,486

6,283

37,057

26,510

-28%

$'000

Net revenue

R'000

-28%

470,683

652,930










11,382

12,337

8%

$'000

Direct operating costs

R'000

9%

219,045

200,542

4,208

3,404

-19%

$'000

Indirect operating costs

R'000

-18%

60,434

74,137

788

733

-7%

$'000

General and administrative costs

R'000

-6%

13,018

13,887

20,005

9,784

-51%

$'000

Group EBITDA5

R'000

-51%

173,764

352,486

990

1,581

60%

$'000

Net Interest

R'000

61%

28,079

17,439

13,647

6,112

-55%

$'000

Net profit5

R'000

-55%

108,549

240,468










3,621

1,864

-49%

$'000

Capital Expenditure

R'000

-48%

33,106

63,802










123,895

144,182

16%

$'000

Cash Balance

R'000

22%

2,567,881

2,112,416













R/$

Ave R/$ rate

R/$

1%

17.76

17.62




R/$ 

Spot R/$ rate 

R/$ 

4%

17.81

17.05













 

Unit Cost/Efficiencies

 




590

688

17%

$/oz

SDO Cash Cost Per 4E PGM oz4

R/oz

17%

12,219

10,404

462

539

17%

$/oz

SDO Cash Cost Per 6E PGM oz4

R/oz

18%

9,572

8,142

751

843

12%

$/oz

Group Cash Cost Per 4E PGM oz4

R/oz

13%

14,972

13,237

588

660

12%

$/oz

Group Cash Cost Per 6E PGM oz4

R/oz

13%

11,722

10,360

867

932

7%

$/oz

All-in sustaining cost (4E)

R/oz

8%

16,548

15,279

1,010

1,007

0%

$/oz

All-in cost (4E)

R/oz

0%

17,883

17,803










The Sylvania cash generating subsidiaries are incorporated in South Africa with the functional currency of these operations being ZAR.  Revenues from the sale of PGMs are incurred in USD and then converted into ZAR.  The Group's reporting currency is USD as the parent company is incorporated in Bermuda.  Corporate and general and administration costs are incurred in USD, GBP and ZAR. 

1  PGM plant recovery is calculated on the production ounces that exclude the work-in-progress ounces of approximately 1,500 ounces from December, delivered in January 2023.

2  The gross basket price in the table is the March 2023 gross 4E basket used for revenue recognition of ounces delivered in Q3 FY2023, before penalties/smelting costs and applying the contractual payability.

3  Revenue (6E) for Q3, before adjustments is $28.0 million (6E prill split is Pt 52%, Pd 17%, Rh 9%, Au 0%, Ru 17%, Ir 5%).  Revenue excludes profit/loss on foreign exchange.

4  The cash costs include direct operating costs and exclude indirect costs such as royalty tax and EDEP payments.

5  The net profit and Group EBITDA excludes the profit on the sale of Grasvally Chrome Mine (≈$1.4 million) previously held as an asset held for sale.

 

A. OPERATIONAL OVERVIEW

 

Health, safety and environment

Health, safety and environment remains a focus area on all operations and the Company is pleased to report that no significant occupational health or environmental incidents occurred during the quarter. While Lannex achieved three-years Lost-Time Injury ("LTI") free during the period and Doornbosch operation remains at 10 years LTI-free, we unfortunately experienced one LTI at the Mooinooi operation (ankle sprain), and one LTI at the Lesedi operation (knee sprain) during March 2023.  Millsell and Tweefontein both remain LTI-free for more than a year.

 

Operational performance

The SDO delivered 17,926 4E PGM ounces for the quarter. This is above target as the third quarter historically yields lower production as a result of the January ramp up at the host mines, but still represented a 7% decrease in ounces on the previous quarter.  PGM feed grades and volumes were consequently impacted due to lower ROM and current arisings material during the period, and the shorter February month. PGM feed grade and recoveries were 10% and 8% above the business plan for the quarter while quarter on quarter performance was lower with PGM flotation plant throughput decreasing by 6%.

 

Although the total SDO recovery efficiency is slightly down for the quarter in line with expectations for blend of feed material received, the commissioning and optimisation of the Tweefontein MF2 has contributed to an 8% above plan recovery, which will be a significant contributor going forward. Overall, the SDO operations performed well and further improvements are expected during the fourth quarter.  

 

Lesedi experienced increased Eskom load curtailment this quarter of 95.6hrs, which impacted throughput, stability and performance. As part of its mitigating measures, the Company is in the process of procuring back-up power generators for Lesedi and Millsell, and these should be commissioned during Q1 FY2024. Lannex recoveries under the revised reagent regime remain above business plan with further optimisation ongoing.

 

SDO operating cash costs per 4E PGM ounce increased 17% in both rand and dollar terms to ZAR12,219/ounce and $688/ounce (Q2: ZAR10,404/ounce and $590/ounce) respectively. The increase in cash costs per ounce is principally a result of the lower ounces produced in the quarter and the 1% depreciation of the average ZAR:USD exchange rate.  

 

The Group incurred capital expenditure of ZAR33.1 million ($1.9 million), in line with planned capital project schedules.  The main contributors were ZAR11.4 million ($0.6 million) spent on the MF2 project, ZAR8.2 million ($0.5 million) on stay-in-business capital and tailings dams and ZAR8.9 million ($0.5 million) on exploration.

 

Operational focus areas 

The successful implementation of the formal planned maintenance system at Millsell, together with the operational focus on equipment runtime and stability, has produced improved results at the plant for the quarter. The roll out of the system at additional operations is underway.

 

The Mooinooi operation continues to monitor the ROM grades received from the host mine which have decreased but remained above the business plan, and this is an ongoing focus area for the Company.

 

Cost control and optimisation continues with positive results and unit costs well in line with the business plan year to date. Ongoing improvements remain a focus area on all operations and are expected to further reduce costs.

 

Operational opportunities 

Optimisation of blending opportunities from the current SDO surface resources has provided positive results, especially at the Eastern operations.

 

Construction of the Lannex MF2 Plant continues and is on target to commence commissioning during Q1 FY2024, which follows the successful roll-out and performance of similar MF2s at all other SDO operations between 2017 and 2023.

 

Testwork on reagent optimisation is ongoing in collaboration with suppliers.

 

 

B. FINANCIAL OVERVIEW

 

Financial performance

Revenue (4E) for the quarter decreased by 24% to $25.0 million (Q2: $33.1 million), impacted by the 21% decrease in the basket price recorded in March and applied to calculate revenue for ounces produced and delivered in the quarter but only invoiced in Q4. The average 4E gross basket price for the quarter was $1,932/ounce against $2,432/ounce in Q2 with the largest commodity price drop noted in rhodium and palladium. Net revenue for the quarter, which includes base metals and by-products and the quarter-on-quarter sales adjustment, was $26.5 million (Q2: $37.1 million). The downwards sales adjustment in dollar and rand terms is due to the reversal of provisional revenue raised in Q2, which was reversed and re-raised in Q3 at the actual prices in accordance with the off-take agreements. Net revenue also includes attributable revenue received for ounces produced from material processed from a third-party on a trial basis. 

 

Group cash costs per 4E PGM ounce increased by 13% in rand terms from ZAR13,237/ounce to ZAR14,972/ounce and increased 12% in dollar terms from $751/ounce in the previous quarter to $843/ounce.

 

General and administrative costs decreased from $0.79 million to $0.73 million. These costs are incurred in USD, GBP and ZAR and are impacted by the exchange rate fluctuations over the reporting period.

 

Group EBITDA for the quarter was $9.8 million (Q2: $20.0 million) and net profit was $6.1 million (Q2: $13.6 million), the decrease was primarily a result of the lower basket price and higher total group costs (direct and indirect cash and non-cash costs).  

 

The Group cash balance increased 16% to $144.2 million at the quarter end (Q2: $123.9 million). Cash generated from operations before working capital movement was $9.8 million, with net changes in working capital amounting to $12.9 million, which is mainly due to the changes in trade debtors. The decrease in the basket price and lower ounce production during Q3 resulted in a lower trade debtors balance quarter-on-quarter, as trade debtors arise from the concentrate delivered in the quarter but paid for in the following quarter per the off-take agreement.

 

The Group spent $1.9 million on capital for the quarter compared to $3.6 million in the previous quarter. Dividend tax of $0.5 million was paid to the authorities on the payment of a dividend from a subsidiary to the holding company.

 

The impact of exchange rate fluctuations on cash held at the end of Q3 FY2023 was $1.4 million loss due to the spot ZAR to USD exchange rate at 31 March 2023 depreciating by 4%.

 

C. MINERAL ASSET DEVELOPMENT

 

The Group owns various mineral asset exploration and development projects on the Northern Limb of the Bushveld Igneous Complex located in South Africa, for which it has approved mining rights. Targeted studies are underway on both the Volspruit and Northern Limb PGM opportunities to determine how best to optimise the respective projects. Progress has been made towards unlocking mineral potential on these projects to generate value for shareholders.

 

Volspruit Project

Following the release of the Results and Resource Statement in October 2022, the revised Scoping Study to include the remaining 42% of the total project area consisting of the South Body is currently underway. Relogging of the South Body has been completed and the remaining relogging of the North Body will be completed in early May. The results from the rhodium sampling will be received during Q4 FY2023 and will also include iridium and ruthenium to be evaluated as part of the same study. While the initial Scoping Study completed on the North Body relied on the validated borehole database to complete the Study, further relogging was scheduled to define the geological constraints of the mineralisation. The relogging and additional sampling data collected will be subject to an updated Volspruit MRE, which will include rhodium resource over 100% of the project area. The updated MRE will then be subject to a Preliminary Economic Assessment ("PEA") during Q1 FY2024 as previously reported.

 

The permitting requirements under the Mining Right as communicated in the interim report continues. The Water-Use Licence, the updating of the Environmental Impact Assessment ("EIA") and the finalisation of the Social and Labour Plan are all included within these activities.

 

 

Far Northern Limb Projects

Continued resource optimisation studies are underway on the entire strike extent of the newly discovered T-Zone of the Aurora project. By applying the new geological interpretation, relogging of the historical boreholes in the possession of the Company has been completed over 8.4km of the 16.7km of the projects near surface strike length. It can be reported that of the historical core, 102 of the 159 drillholes in the Company's possession have been fully relogged. The relogging will inform the continuity of mineralised T-Zone and provide inputs for an optimised exploration strategy. The outcomes of the optimised exploration strategy will be subject to a preliminary MRE, which will indicate the size of a potential MRE over the entire strike length of the Aurora project and determine any infill studies that may be required. A PEA will only be commissioned once an updated MRE for the combined Aurora project is available.

 

Progress towards declaring a maiden Mineral Resource on the Hacra project continues, and the relogging of both the Hacra North underground and the Hacra South near surface historical core, implementing the new geological interpretation, has been completed.

 

D. CORPORATE ACTIVITIES

 

Notification of Transaction by PDMR

The Company announced on 31 March 2023 that Eileen Carr, Non-Executive Director sold and subsequently purchased 13,811 ordinary shares of $0.01 each in the Company ("Ordinary Shares") for her Self-Invested Pension Plan ("SIPP") at 89 pence per Ordinary Share.

 

Following the two transactions her shareholding in the Company remained unchanged at 70,000 Ordinary Shares, representing 0.02% of the total number of Ordinary Shares with voting rights.

 

 

CONTACT DETAILS

 

For further information, please contact:

 

Jaco Prinsloo CEO

Lewanne Carminati CFO

+27 11 673 1171

 


Nominated Adviser and Broker


Liberum Capital Limited

+44 (0) 20 3100 2000

Richard Crawley / Scott Mathieson / Kane Collings


 

Communications


BlytheRay

+44 (0) 20 7138 3205

Tim Blythe / Megan Ray / Rachael Brooks

sylvania@BlytheRay.com

 

 

CORPORATE INFORMATION

 

Registered and postal address:

Sylvania Platinum Limited

 

Clarendon House

 

2 Church Street

 

Hamilton HM 11

 

Bermuda

 

SA Operations postal address:

PO Box 976

 

Florida Hills, 1716

 

South Africa

 

 

 

Sylvania Website: www.sylvaniaplatinum.com

 

 

 

About Sylvania Platinum Limited

 

 

Sylvania Platinum is a lower-cost producer of platinum group metals (PGM) (platinum, palladium and rhodium) with operations located in South Africa. The Sylvania Dump Operations (SDO) comprises six chrome beneficiation and PGM processing plants focusing on the retreatment of PGM-rich chrome tailings materials from mines in the Bushveld Igneous Complex. The SDO is the largest PGM producer from chrome tailings re-treatment in the industry. The Group also holds mining rights for PGM projects in the Northern Limb of the Bushveld Complex.

 

 

For more information visit https://www.sylvaniaplatinum.com/



ANNEXURE

 

GLOSSARY OF TERMS FY2023

The following definitions apply throughout the period:

4E PGMs

4E PGM ounces include the precious metal elements Platinum, Palladium, Rhodium and Gold

6E PGMs

6E ounces include the 4E elements plus additional Iridium and Ruthenium

AGM

Annual General Meeting

AIM

Alternative Investment Market of the London Stock Exchange

All-in sustaining cost

Production costs plus all costs relating to sustaining current production and sustaining capital expenditure.

All-in cost

All-in sustaining cost plus non-sustaining and expansion capital expenditure

Current risings

Fresh chrome tails from current operating host mines processing operations

DMRE

Department of Mineral Resources and Energy

EBITDA

Earnings before interest, tax, depreciation and amortisation

EIA

Environmental Impact Assessment

EIR

Effective interest rate

EMPR

Environmental Management Programme Report

ESG

Environment, Social and Governance

GBP

Pounds Sterling

IFRIC

International Financial Reporting Interpretation Committee

IFRS

International Financial Reporting Standards

JORC

Australian Joint Ore Reserves Committee

LSE

London Stock Exchange

LTI

Lost-time injury

LTIFR

Lost-time injury frequency rate

MF2

Milling and flotation technology

MPRDA

Mineral and Petroleum Resources Development Act

MRA

Mining Right Application

MRE

Mineral Resource Estimate

NWA

National Water Act 36 of 1998

PGM

Platinum group metals comprising mainly platinum, palladium, rhodium and gold

PDMR

Person displaying managerial responsibility

PEA

Preliminary Economic Assessment

Pipeline ounces

6E ounces delivered but not invoiced

Pipeline revenue

Revenue recognised for ounces delivered, but not yet invoiced based on contractual timelines

Pipeline sales adjustment

Adjustments to pipeline revenues based on the basket price for the period between delivery and invoicing

PFS

Pre-Feasibility Study

Project Echo

Secondary PGM Milling and Flotation (MF2) program announced in FY2017 to design and install additional new fine grinding mills and flotation circuits at Millsell, Doornbosch, Tweefontein, Mooinooi and Lesedi.

Revenue (by products)

Revenue earned on Ruthenium, Iridium, Nickel and Copper

Rh

Rhodium

ROM

Run of mine

SDO

Sylvania dump operations

Sylvania

Sylvania Platinum Limited, a company incorporated in Bermuda

TRIFR

Total recordable injury frequency rate

TSF

Tailings storage facility

UNSDGs

United Nations Sustainability Development Goals

USD

United States Dollar

WULA

Water Use Licence Application

UK

United Kingdom of Great Britain and Northern Ireland

ZAR

South African Rand

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
QRTGUGDSIXDDGXI